Project |
Type |
Location/Objective |
Commencement |
Target Completion Date |
Description |
Progress
as at |
Remarks |
|
Transport Connectivity & Asset Management Project (TCAMP) |
Foreign Aid Loan |
The main objectives of developing and operationalizing Road Asset Management System in the RDA are to optimize the economic benefit by minimizing the road maintenance costs and road user cost, determination of timing & cost of interventions to reduce life cycle cost and Monitor and track performance of completed work. | 08/07/2018 |
31/03/2023 |
Scope of works :- Institutional Strengthening and Capacity Building (RDA) | |||
1. | Operationalizing asset management system and unit; related capacity building | 7.27% | ||||||
2. | Capacity Building, training, and consultancies, Road Safety | 2.04% | ||||||
3. | Equipment | |||||||
4. | Incremental Operating Cost | 15.96% | ||||||
5. | Work deleted under Restructuring | 100% |
Name of the Project Road (Section / Bridge No) |
Project Type | Funding Agency | Location | Length of the Bridge(m) |
Width Bridge(m) |
Commencement Date | Target Completion Date | Description | Physical Progress as at 30th June 2020 |
Construction of bridge nos. 53/1 & 53/2 on Colombo-Ratnapura-Wellawaya - Batticaloa (A004) Road (CRIP/WORKS/RDA/NCB/304) | Foreign Aid Loan | World Bank | Bridge Nos. 53/1 & 53/2 | 420m | 24m | 08.02.2017 | 07.02.2018 | Decided to go for mutual termination due to delay in land acquisition. The objective of flood prevention has been achieved by improving flow of 53/5 Bridge | 29% |
Rectification of Land Slide Between Culvert No 75/5 to 76/4 on Peradeniya - Badulla - Chenkaladi Road (A005) Road (CRIP/WORKS/RDA/NCB/308) | Foreign Aid Loan | World Bank | Culvert No 75/5 to 76/4 | - | - | 25.05.2017 | 31.08.2020 | Delay due to slow progress of the contractor and rainy weather, covid 19 | 93.50% |
Re- Construction of Bridge No. 23/1 on Warakapola - Ruwanwella Road (B457) (CRIP/WORKS/RDA/NCB/318) | Foreign Aid Loan | World Bank | Bridge No. 23/1 | 240m | 10.4m | 21.06.2017 | 19.11.2020 | Delayed due to slow Progress of the Contractor,land Acquisition, inclement weather , covid 19 | 76.66% |
Construction of New Bridge at CH 15+500,at Thalwila Estuary on Nainamadama -Iranawila-Chilaw (B640) Road (CRIP/WORKS/RDA/NCB/320) | Foreign Aid Loan | World Bank | Bridge at CH 15+500,at Thalwila Estuary | 80m Bridge & 100m approach on either sides | 10.4m | 27.03.2019 | 30.11.2020 | Work in progress | 71% |
Design and Construction of Rock fall Protection Works Between Culvert Nos. 41/9 and 41/10, between 50th km and Culvert No.51/1 & between Culvert Nos. 55/3 and 55/6 on Kandy -Mahiyanginuyu Road (A026) (CRIP/WORKS/RDA/NCB/321) | Foreign Aid Loan | World Bank | Culvert Nos. 41/9 and 41/10, between 50th km and Culvert No.51/1 & between Culvert Nos. 55/3 and 55/6 | - | - | 03.07.2019 | 30.10.2020 | Work in progress | 51% |
Supply and installation of Instruments in Land Slide areas in A026, A004, A005 & A007 Roads (CRIP/WORKS/RDA/NCB/323) | Foreign Aid Loan | World Bank | Land Slide areas in A026, A004, A005 & A007 Roads | - | - | 19.06.2019 | 30.09.2020 | Work in progress | 60% |
Re-Construction of Bridge No. 60/5 on Thiruwanketiya - Agalawatta (B421)Road (CRIP/WORKS/RDA/NCB/325) | Foreign Aid Loan | World Bank | Bridge No.60/5 | 150m | 10.4m | 20.09.2019 | 21.10.2020 | Work in progress | 63% |
i) Re-Construction of Bridge No. 98/4 on Colombo- Ratnapura - Wellawaya - Batticaloa (A004) Road ii) Re-Construction of bridge at ch. 0+480 km on Ehaliyagoda Bypass Road (CRIP/WORKS/RDA/NCB/326) |
Foreign Aid Loan | World Bank | Bridge No. 98/4 Bridge & 0+480km on Ehaliyagoda Bypass Road | i) 80m ii) 150m |
i) 12.4m ii) 16m |
18.10.2019 | 30.11.2020 | Work in progress | 48.89% |
Construction of a New Bridge by replacing existing causeway No. 1/2 on Sri Baritheendra Mawatha (B397(h)) across Malwathu oya, Anuradhapura (CRIP/WORKS/RDA/NCB/327) | Foreign Aid Loan | World Bank | Causeway No. 1/2 on Sri Baritheendra Mawatha (B397(h)) across Malwathu oya, Anuradhapura | 1150m | 9.80m | 09.10.2019 | 15.12.2020 | Work in progress | 65% |
Re-Construction of 02 Nos Bridges [ 6/1, 6/3 on KRW B168 RD.] on National Highways In Gampaha Chief Engineer’s Region (CRIP/WORKS/RDA/NCB/329) | Foreign Aid Loan | World Bank | Bridge No. 6/1 and Bridge No. 6/3 | 120m | 10.4m | 15.05.2020 | 14.10.2020 | Delayed due to late Mobilization of the Contractor and submission of documents to sign Contract. | 2.00% |
Re-Construction of 03 Nos Bridges [2/3 PH B354 rd., 6/1 MI B285 rd., 3/3 KN B207 rd.] on National Highways in Colombo & Kaluthara Chief Engineer’s Region (CRIP/WORKS/RDA/NCB/330) | Foreign Aid Loan | World Bank | Bridge No. 2/3 & Bridge No. 6/1 & Bridge No. 3/3 | 250m | 10.4m | 18.05.2020 | 17.10.2020 | Work in progress | 22% |
Re-construction of 02 nos. bridges [31/2, 15/3 ] on Paranthan - Mulativu - Knochchi Road in Mulativu Chief Engineer’s Region (CRIP/WORKS/RDA/NCB/333) | Foreign Aid Loan | World Bank | Bridge No. 31/2 and Bridge No 15/3 | 100m | 10.4m | 05.05.2020 | 04.10.2020 | Work in progress | 20% |
Re-construction of Bridge No. 18/1 & Bridge No.18/2 on Nawalapitiya - Dolosbage (B 318) Road in Kandy Chief Engineer’s Region (CRIP/WORKS/RDA/NCB/334) | Foreign Aid Loan | World Bank | Bridge No. 18/1 & 18/2 | 100m | 8.5m | 26.05.2020 | 05.11.2020 | Work in progress | 3% |
Name of the Project Road Road section / Bridge No) |
Project Type |
Location |
Length of the Road (km) / Bridge (m) |
Commencement Date |
Target Completion Date |
Description |
Progress as at 30.06.2020 |
Remarks |
||
Improvements to Central Expressway Connectivity Roads in Kandy and its suburbs | Foreign Aid Loan | Procurement of Consultant for feasibility study | - | |||||||
Preparation of Social and Environment Impact Assessment Report | - | |||||||||
Preparation of Detailed Project Report | - | |||||||||
Short Term Requirement | ||||||||||
1) Rehabilitation & Improvements of Katugastota - Madawala (B205) Road, section (ch 0+000 - 6+250 km) & Madawala - Digana (B 256) Road, section (ch 0+000 - 8+100 km) to (02) Two Lane Standard using Performance Based Road Contracting Method | 14.35 | i) Topographical Survey | 100% | |||||||
ii) Preliminary Geometrical Design | 100% | |||||||||
iii) Preparation of Acquisition Plan | 100% | |||||||||
iv) Land Acquisition | - | |||||||||
2) Construction of a parallel tunnel to the existing Mahiyawa tunnel on Kandy - Jaffna (A009) Road | i) Topographical Survey | 100% | ||||||||
ii) Preliminary Geometrical Design | 100% | |||||||||
iii) Preparation of Acquisition Plan | - | |||||||||
iv) Land Acquisition | - | |||||||||
Long Term Requirement | ||||||||||
1) Widening & Improvements of section of Katugasthota - Kurunegal - Puttalam (A010) Road from Katugasthota to Galagedara (from ch. 0+300 km to ch. 13+500 km) | 13.2 | i) Topographical Survey | 100% | |||||||
ii) Preliminary Geometrical Design | 60% | |||||||||
iii) Preparation of Acquisition Plan | ||||||||||
iv) Land Acquisition | ||||||||||
2) Construction of By - pass Road at Katugasthota Town connecting A009 & A010 Roads (new road) | 0.55 | i) Topographical Survey | 100% | |||||||
ii) Preliminary Geometrical Design | 75% | |||||||||
iii) Preparation of Acquisition Plan | 50% | |||||||||
iv) Land Acquisition | 1% | |||||||||
3) Widening & Improvements of Aladeniya - Eriyagama (from ch. 0+ 000 km) (B 005) Road | 10 | i) Topographical Survey | 100% | |||||||
iii) Preparation of Acquisition Plan | ||||||||||
iv) Land Acquisition | ||||||||||
4) Widening and Improvements of Barigama - Haloluwa (B 537 ) Road (from ch.0 + 000 km to ch. 5 + 760 km) | 5.76 | i) Topographical Survey | 100% | |||||||
ii) Preliminary Geometrical Design | 75% | |||||||||
iii) Preparation of Acquisition Plan | ||||||||||
iv) Land Acquisition | ||||||||||
5) Widening and Improvements of Ambatenna - Bokkawala - Arabekade (B015) Road 2.50 km | 2.5 | i) Topographical Survey | ||||||||
ii) Preliminary Geometrical Design | ||||||||||
iii) Preparation of Acquisition Plan | ||||||||||
iv) Land Acquisition | ||||||||||
6) Widening and Improvements of Alawathugoda - Pujapitiya (B377) Road from ch. 0 + 000 km to ch. 7 + 500 km & B204 from ch. 7+ 500 km to ch. 8 + 100 km) | 8.1 | i) Topographical Survey | ||||||||
ii) Preliminary Geometrical Design | ||||||||||
iii) Preparation of Acquisition Plan | ||||||||||
iv) Land Acquisition |
Designation
|
Name |
Telephone |
Fax |
E - mail |
Badulla Chenkaladi Road Improvement Project (BCRIP) | ||||
Postal Address: 5th Floor, "Sethsiripaya - Stage I ", Battaramulla. | ||||
Project Director (Acting) | Mr. A.P.K.Abeydeera | 011 2872767 |
011 2872366 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Project Director | Mr. P. Sundaraeswaran | 011 2861256 |
011 2872366 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mrs. Y. P. S. S. Yapa | 011 2872767 |
011 2872366 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. G. A. D. I. Wimaladharma | 076 9489993 |
- |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. N. Thiruvarudeshan | 076 8852678 |
- |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. A.M.Zarshi | 077 7783940 |
- |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Accountant | Mrs. T. D. Joseph | 011 2886383 |
011 2872366 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Project Secretary | 011 2872767 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Internal Auditor | Mr. W.A.V.Warnakulasooriya | 011 2872767 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Office (Gen.) | 011 2872767 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Top | ||||
Central Expressway Project | ||||
Central Expressway Project - Section 1 (Kadawatha - Mirigama) |
||||
Postal Address: Project Director's Office, Central Expressway Project Section I, Wing I, 5th Floor, "Sethsiripaya ", Battaramulla. | ||||
Project Director | Mrs. T.S.H. Abewickrema | 011 2872774 |
011 2875736 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Project Director | Mr. A.M. Raffi | 033 2298685 |
033 2298685 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Project Director | Mr. S. B. D. Dahanayake | 011 2877594 |
011 2875736 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Senior Engineer | Mr. C.S.R. Somanayake | 011 2877594 |
011 2875736 |
This email address is being protected from spambots. You need JavaScript enabled to view it.
|
Senior Engineer | Mrs. S. M. S. S. Senanayake | 011 2971782 |
011 2971788 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. A. M. A. W. Amarasekara | 033 2298685 |
033 2298685 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. D. U. Wickramage | 033 2298685 |
033 2298685 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mrs. N. M. Waidyasuriya | 011 2877594 |
011 2875736 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Accountant | Mrs. K. A. A. K. Kariyapperuma | 011 2886646 |
011 2875736 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Administrative Officer | Mr. A. M. D. L. Amasekara | 011 2861220 |
011 2875736 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Administrative Officer | Mrs. W. A. N. U. Wijethunga | 033 2298685 |
033 2298685 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Office (Gen.) | 011 2877594 |
011 2875736 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Central Expressway Project - Section 2 (Mirigama - Kurunegala) |
||||
Postal Address: Central Expressway Project II, Wing I, 3rd Floor, "Sethsiripaya ", Battaramulla. | ||||
Project Director ( CEP II) | Mr. V. Mohan | 011 2868563 |
This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Deputy Director | Mr. K.H.M.A.K. Kehelella | 037 2052791 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Deputy Director |
Mr. S.D.S. Deshapriya | 011 2885290 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Engineer | Mr. W S C Perera | 037 2266496 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Engineer | Mr. W M C P K Wijepala | 037 2052791 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Engineer | Mr. Udukumbura | 037 2052791 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Accountant | Mr. A. H. B. Hettiarachchi | 011 2885064 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Secretary | Ms. K. M. N. C. Kumarasinghe | 011 2885202 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Administrative Officer | Mr. R. J. V. P. Rangana | 011 2885202 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Office (Gen.) | 011 2885202 011 2868563 |
011 2885209 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Central Expressway Project - Section 3 (Pothuhera - Galagedara) | ||||
Postal Address: 26, Wing I, 3rd Floor, "Sethsiripaya ", Battaramulla. | ||||
Project Director | Mr. L. V. S. Weerakoon |
011 2873232 |
011 2877708 |
This email address is being protected from spambots. You need JavaScript enabled to view it.
|
Deputy Director | Mr. J.A. G. R Jayalath |
011 2862461 |
011 2877708 |
|
Deputy Director | Mr. A. G. Ariyawansa |
037 2056396 |
037 2056396 |
|
Deputy Director | Mr. N. Wimalasiri |
037 2056396
|
037 2056396
|
|
Senior Engineer | Mr. B.G.Gunasiri |
037 2056396
|
037 2054309
|
|
Senior Engineer | Ms. K. A. K. Karunaprema |
081 2054992
|
081 2054994
|
|
Senior Engineer | Mr. T. B. A. Wijenayake |
081 2054994
|
081 2054994
|
|
Engineers (Design Office) |
081 2054992
|
081 2054994
|
||
Engineers (Head Office) |
011 2877189/
011 2862801 |
011 2877708
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Engineers (Site Office - Kurunegala) |
037 2056396
|
037 2054309
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Accountant | Mr.K.Premadasa |
011 2877708 |
011 2877708 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Administrative Officer | Ms. H. M. T. Kaushalya |
011 2877708 |
011 2877708 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Office (Gen.) |
011 2877708 |
011 2877708 |
||
Central Expressway Project - Section 4 (Kurunagala - Dambulla) | ||||
Postal Address: 1st Floor, Stage I , "Sethsiripaya", Battaramulla. | ||||
Project Director | L.V.S. Weerakoon | 011 2872576 |
011 2872577
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineers | G.Athukorala, M.R.C.U.Alwis G.H.T.H.L.P.U.Wimalarathne D.M.C.P. Dissanayake, K.W. Senani |
011 2886771
037 2057069 |
011 2872577
037 2057069 |
|
Accountant | W.G.K.L. Wijesekara |
011 2872576
|
011 2872577
|
|
Office (Gen.) |
011 2872452
|
|||
Top | ||||
Elevated Highway Projects | ||||
Port Access Elevated Highway Project | ||||
Postal Address: Project Office ,1st Floor, Chaithya Road, Colombo 01 | ||||
Project Director (Acting) | Mr. K.W. Kandambi | 0117966381 |
This email address is being protected from spambots. You need JavaScript enabled to view it.
|
|
Senior Engineer | Mr. G.S. Ranga | |||
Project Engineer I | Mr. K.P.N.S. Nimalasena | |||
Project Engineer II | Mr. G.M.H.Dhanapala | |||
Project Engineer III | Mr. V. Suthahar | |||
Project Engineer IV | Mr. N.W.H. Lakshamana | |||
Project Accountant (Acting) | Mr. K.A. Piyaseeli | |||
Financial Assistant | Mr. H.L.Yamitha Thilanka | |||
Administrative Assistant | Mrs.K.D. Sunethra | |||
Office (Gen.) | ||||
Elevated Highway Project (New Kelani Bridge to Athurugiriya) | ||||
Postal Address: 428/1, Robert Gunawardena Mw., Koswatta, Battaramulla | ||||
Project Director | Mr. K. Selvanathan | 011 2882992 |
011 2878019
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Project Director | Mr. S.M.P. Suriyabandara | 011 2882126 |
||
Project Engineer I | Mr. D.P. Kaluarachchi | 011 2889533 |
||
Project Engineer II | Ms. K.G.M.P. Rupasinghe | 011 2882138 |
||
Project Engineer III | Mr. D. C Karunarathne | 011 2882138 |
||
Project Accountant | Mr. B.S. Keerthi | 011 2861101 |
||
ICT Officer | Mr. M.S.M. Fasil | 011 2882138 |
||
Project Secretary | Mrs. Anusha Abeywardana | 011 2882138 |
||
Office (Gen.) | 011 2882138 |
|||
Top | ||||
EXIM Bank Funded Hunan Project | ||||
Postal Address: Project Director’s Office (Exim Bank Funded Hunan Project), Road Development Authority, 1stFloor, “Sethsiripaya” (Stage 1) Battaramulla | ||||
Project Director | Mr. M.R.Sudath | 011 2877716 |
011 2862928
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mrs. G.T. Dananjani | 011 2862896 |
011 2862928
|
|
Engineer | Mr.R.H.G.I.K. Chamara | 011 2862896 |
011 2862928
|
|
Accountant | Mrs. Shyama Neelamanee | 011 2877729 |
011 2883069 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Administrative Assistant | Mr. A. P.C.A. Jayamal | 011 2886110 |
011 2883069 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Office (Gen.) | 011 2862928 |
011 2862928
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Top | ||||
Extension of Southern Expressway Project (ESEP) | ||||
Extension of Southern Expressway Project - Section-1 (Matara to Baliatta) | ||||
Postal Address: Extension of Southern Expressway Project - Section 1, Project Director's Office, Kadawedduwa, Yatiyana | ||||
Project Director | Mr. M. S. Nilawfer | 041 2246247 |
041 2246367
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Project Director | Mrs. N. B. G. Imali | 041 2246242 |
041 2246240
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Chief/Senior Engineer | Mr. L. P. N. Samarasinghe | 041 2246247 |
041 2246367
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. M. G. D. A. Siriwardana | 041 2246247 |
041 2246367
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. L. G. L. P. Silva | 041 2246242 |
041 2246240
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. D. G. I. A. Tillekaratna | 041 2246242 |
041 2246240
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. Y. A. Naotunna | 041 2246242 |
041 2246240
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Accountant | Mr. K. S. P. Perera | 041 2246247 |
041 2246367
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Office (Gen.) | 041 2246247 |
041 2246 367
|
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Extension of Southern Expressway Project - Section - 2 (Beliatta to Wetiya) | ||||
Postal Address: Extension of Southern Expressway Project - Section 2, Project Director's Office, Sooriyapokuna, Uswewa | ||||
Project Director | Mr. K. W. Kandambi | 047 4935600 |
047 7634030 047 7634031 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Project Director | Mr. K. Chandrakumara | This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Engineer | Mr. W. O. C. Kumara | |||
Accountant | Mr. S. Dassanayake | |||
Office (Gen) | ||||
Extension of Southern Expressway Project - Section - 3 (Wetiya to Andarawewa) | ||||
Postal Address: Extension of Southern Expressway Project - Section 3, Project Director’s Office, Sooriyapokuna, Uswewa. | ||||
Project Director | Mr. K.W.Kandambi | 047 4935602 |
047 7634030 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. H.W.S.Lolitha | 076 8270065 |
047 7634031 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Accountant | Mr. S. Dasanayake | 047 3220301 |
047 7634031 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Office (Gen.) | 047 4935600 |
047 7634030 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Extension of Southern Expressway Project - Section- 4 (Mattala to Hambantota via Andarawewa ) | ||||
Postal Address: Extension of Southern Expressway Project - Section 4, Project Director’s Office, In front of the Botanical Garden, Sooriyawewa Road, Hambantota. | ||||
Project Director | Mr. A. P. K. Abeydeera | 071 8399790 / 047 3220971 |
047 4545955 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. C. Kodithuwakku | 071 4408509 / 047 3220970 |
This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Engineer | Mr. H.A.R.R. Amarathunga | 077 2833878 / 047 3220970 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Engineer | Mr. N. Lohis | 077 2547275 / 047 3220967 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Accountant | Mr. A.P.R. Kulasiri | 070 2588599 / 047 3220965 |
||
Office (Gen.) | 047 3220972 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Top | ||||
Integrated Road Investment Program (iRoad Program) | ||||
iRoad Program - Project Co-ordination / Western Province Office | ||||
Postal Address: 12th Floor, "Sethsiripaya Stage II", Battaramulla. | ||||
Project Director | Mrs. K.R.D.J.K. Weerakoon | 011 2186130 |
011 2187166 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Director | Mrs. D.S.N. Wijesinghe | 011 2186130 |
||
Senior Engineer | Mr. E.M.A. Gunathilake | 011 2187164 |
||
Project Accountant | Ms. L. Amarasena | 011 2186041
|
||
Project Accountant | Mr. A.G.K. Somarathna | 011 2186041
|
||
Office (Gen.) | 011 2186130
|
|||
iRoad Program - Central Province Office | ||||
Postal Address: No. 431, Subodharama Road, Peradeniya | ||||
Project Director | Mr. A.S.A. Azher | 081 2077898 |
081 2077898 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
iRoad Program - North Central Province Office | ||||
Postal Address: No. 1198/81, Stage II, Buddhagaya Mawatha, Mailagas Junction, Anuradhapura. | ||||
Project Director | Mr. J. Siriniwasan | 025 2234599 |
025 2227098 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
iRoad Program - Southern Province Office | ||||
Postal Address: No. 76, Swaraj Road, Issadeen Town, Matara. | ||||
Actg. Project Director | Mr. S.R. Pathirana | 041 2238969 |
041 2238979 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
iRoad Program - North Western Province Office | ||||
Postal Address: No. 27, Ganewatta Road, Horambuwa, Wariyapola. | ||||
Project Director | Mr. R.M.P. Rathnayake | 037 2268445 |
037 2268446 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
iRoad Program - Sabaragamuwa Province Office | ||||
Postal Address: Yatiyanthota Road, Atulugama, Dehiowita. | ||||
Project Director | Mr. A.A. Premathilaka | 036 2265522 |
036 2265377 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Top | ||||
Landslide Disaster Protection Project of the Road Network. | ||||
Postal Address: Landslide Disaster Protection Project (LDPP), RDA, Embilmeegama, Pilimathalawa. | ||||
Project Director | Mr. K. P. Kodituwakku | 081 2056361 |
081 2056360 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Director | ||||
Chief Engineer | Mr. R. M. S. J. B. Ratnayake | 081 2056362 |
081 2056360 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Chief Engineer | Mr. W. M. Gunasinghe | 081 2056362 |
081 2056360 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Project Engineer | Mr. A. M .Anil | 081 2056362 |
081 2056360 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Accountant | Mrs. K. R .R. K. Wijayasundara | 081 2056362 |
081 2056360 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Office (Gen.) | 081 2056362 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Top | ||||
Local Banks Funded Project | ||||
Postal Address: Local Banks Funded Project Division, Wing 'A', 8th Floor, Sethsiripaya Stage II, Battaramulla . | ||||
Project Director | 011 2186044 |
011 2187173 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Office (Gen.) | 011 2187172 011 2187086 011 2867228 |
|||
Miscellaneous Foreign Aided Projects | ||||
Postal Address: No.465, Ganahena, Battaramulla. | ||||
Project Director | 011 2187062 |
011 2187063 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Actg. Project Director | Mr. I.K Baddegama | 011 2186012 |
||
Deputy Project Director | Mr. R.M.J.N. Ratnayake | 011 2186012 |
||
Engineer | Mr. W.A.A. Pushpakumara | 011 2187061 |
||
Engineer | Mr. M.A.M. Sidikie | 011 2187064 |
||
Engineer | Mr. M.K.N. Jayawardena | 011 2187063 |
||
Engineer | Mr. H.M.U.C. Herath | 011 2187063 |
||
Engineer | Mr. R.B.Y.B. Uduweriya | 011 2187064 |
||
Engineer | Mr. E.N.R. Chandrasiri | 011 2187063 |
||
Engineer | Mr. G.A.U. Perera | 011 2186012 |
||
Mechanical Engineer | Mr. S.P.Y. Kumaradasa | 011 2187063 |
||
Material Engineer | Mr. D.P.A. Amarasinghe | 011 2187063 |
||
Accountant | Mr. R.G.T.T. De Weerasinghe | 011 2187064 |
011 2187064 |
|
Administrative Assistant | Mrs. M.A.N. Sanjeewani | 011 2187063 |
011 2187063 |
|
Office (Gen.) | 011 2187063 |
011 2187063
|
||
Top | ||||
New Bridge Construction Project Over Kelani River | ||||
Postal Address : No.18A, Asoka Circle, Gamunu Mawatha, Subuthipura, Battaramulla | ||||
Project Director | Mrs. D. A. S. Jayasekera | 011 5931900 |
011 2867264 |
This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Director | Mr. S. D. L. Tilak | 011 5931901 |
This email address is being protected from spambots. You need JavaScript enabled to view it.This email address is being protected from spambots. You need JavaScript enabled to view it. | |
Deputy Director | Mr. K. C. G. Abhayantha | 011 5931907 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Accountant | Mrs. K. A. Piyaseeli | 011 5931905 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Administrative Assistant | Mrs. Ishari Erandika | 011 2867146 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Office (Gen.) | 011 2867146 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Top | ||||
Outer Circular Highway (OCH) Project | ||||
OCH - Phase III | ||||
Postal Address: 161/1, Rajamalwatta Lane, Battaramulla. | ||||
Project Director | N.K.L. Netthikumara | 011 2877372 |
011 2877317 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Director | K.Ravindralingam | 011 2982079 |
011 2933985 |
|
Chief Engineer | G.N.Weerasooriya | 011 2938976 |
011 2933985 |
|
Engineer | S.A.S.Perera | 011 2877371 |
011 2877317 |
|
Accountant | M.A.N.Pradeepika | 011 2877318 |
011 2877318 |
|
Administrative Officer | T.A.L.Wathsala | 011 3188300 |
011 2877317 |
|
Office (Gen.) | T.C.S.Thenuwara | 011 2877319 |
011 2877317 |
|
Top | ||||
Priority Road Projects | ||||
Priority Road Project 3 (PRP3) - Phase I (A) | ||||
Postal Address: Project Director’s Office, (PRP3-Phase 1), Road Development Authority, 1st Floor, “Sethsiripaya” Stage 1, Battaramulla. | ||||
Project Director | Ms. W.T.I. N. Tissera | 011 2883064 |
011 2864692 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. G. M. Kalansooriya | 011 2040560 |
035 2246029 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. G. S. Ranga | 036 2265150 |
036 2265153 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Accountant | Mrs. Shyama Neelamanee | 011 2877729 |
011 2883069 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Administrative Officer | Mr. Charith Jayamal | 011 2886110 |
011 2883069 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Office (Gen) | 011 2877727 |
011 2864692 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Priority Road Project 3 (PRP3) - Phase I (B) | ||||
Postal Address: No. 07, 1st Floor, "Sethsiripaya" Stage I, Battaramulla | ||||
Project Director | Mr. S.H. Jayasinghe | 011 2869290 |
011 2869653 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Senior Engineer | Mrs. A.M.N.S. Adhikari | 081 5632802 |
- |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. N.P.N.P. Ranasinghe | 011 2889532 |
011 2869653 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. B.M.S.S. Balasuriya | 032 3021050 |
- |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Accountant | Mrs. Shyama Neelamanee | 011 2877729 |
011 2883069 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Administrative Assistant | Mr. A. P.C.A. Jayamal | 011 2886110 |
- |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Office (Gen) | 011 2889532 |
011 2869653 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Priority Road Project 3 (PRP3) - Phase II | ||||
Postal Address: Project Director’s Office (Priority Road Project 3 - Phase II), Road Development Authority, 1st Floor, "Sethsiripaya" (Stage 1), Battaramulla. | ||||
Project Director | Mr. M. R. Sudath | 011 2877716 |
011 2862928 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. H.W.P.K. Jayarathne | 011 2862896 |
||
Engineer | Mr. P.N.A.G.B. Perera | |||
Accountant | Ms. Shyama Neelamanee | 011-2877729 |
011 2883069 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Administrative Officer | Mr. A.P.C.A. Jayamal | 011-2886110 |
011-2883069 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Office (Gen) | 011 2862928 |
011 2862928 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Top | ||||
Road Network Improvement Project (RNIP) - EXIM Bank Funded Hunan Project | ||||
Postal Address: EXIM Bank Funded Hunan Project, P.O.Box No. 30, 1st Floor, "Sethsiripaya" Stage 1, Battaramulla. | ||||
Project Director | Mr. M. R. Sudath | 011 2877716 |
011 2862928 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Senior Engineer | Mr. G.T. Dananjani | 011 2862896 |
011 2862928 |
|
Engineers | Mr. P.N.A.G.B Perera | 011 2862896 |
011 2862929 |
|
Mr. R.H.G.I.K. Chamara | ||||
Mr. W.R.C.Fernando | ||||
Accountant | Mrs. Shyama Neelamani | 011 2877729 |
011 2883069 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Office (Gen) | 011 2862928 |
011 2862928 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Top | ||||
Road Sector Assistance Project (RSAP) | ||||
Postal Address: No. 911, Pannipitiya Road, Battaramulla | ||||
Project Director | Mr.L.U.D.Atapattu |
011 2884594 011 2884595 |
011 2884610 |
This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Director | ||||
Chief Engineer | ||||
Accountant | Ms. Dinuwanthi Joseph | This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Administrative Officer | Mrs. D.A.H. Desilva | This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Office ( Gen.) | ||||
Top | ||||
Ruwanpura Expressway Project | ||||
Postal Address of Project Directors' Office: No. 61, Victoria Estate, Iliba Junction, Munagama, Horana. | ||||
Project Director | Mrs. H.G.N. Premakanthi | 034 2258265 |
034 2258266 |
This email address is being protected from spambots. You need JavaScript enabled to view it.
|
Deputy Project Director | ||||
Office ( Gen.) | 034 2258266 |
|||
Top | ||||
Southern Road Connectivity Project (SRCP) | ||||
Postal Address:Southern Road Connectivity Project, 434/2, Danny Hettiarachchi Mawatha, Ganahena, Battaramulla. | ||||
Project Director | W.K. Kodituwakku | 011 2884047 |
011 2884043 |
This email address is being protected from spambots. You need JavaScript enabled to view it.
|
Deputy Project Director | N.A. Hettiarachchi | 011 2884045 |
||
Accountant | M.A.N. Pradeepika | 011 2884041 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Administrative Officer | R.N.K.D. Silva | 011 2884044 |
||
Office ( Gen.) | 011 2884044 |
|||
Top | ||||
Special Projects Management Unit (SPMU) | ||||
Postal Address: No. 23, 1st Floor, "Sethsiripaya - Stage I", Battaramulla. | ||||
Project Director | S.H. Jayasinghe | 011 2869290 |
011 2869090 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Project Director | R.P.K.T.R. Perera | |||
Senior Engineer | L.P.B. Rathnayake | |||
Senior Engineer | A.V. Thayaparan | |||
Senior Engineer | N.P.N.P. Ranasinghe | |||
Project Engineer | P.T.A. Wijenayake | |||
Project Engineer | R.A.U.D. Rajapaksha | |||
Accountant | B. N. Perumpuli | |||
Internal Audit | C. Madawala | |||
Project Secretary | Surangika Elwatta | |||
Senior Management Assistant | G.M.C.U. Kumara | |||
Office ( Gen.) | 011 2869091
|
011 2869090
|
||
Top | ||||
UK Steel Bridge Project | ||||
Postal Address: 8th Floor, Wing A, "Sethsiripaya - Stage II ", Battaramulla. | ||||
Office (Gen.) | 011 2187187 |
011 2186040 |
This email address is being protected from spambots. You need JavaScript enabled to view it. | |
Top | ||||
World Bank Funded Transport Connectivity and Asset Management Project | ||||
Transport Connectivity & Asset Management Project (TCAMP) | ||||
Postal Address: No. 07, 1st Floor, "Sethsiripaya" Stage I, Battaramulla | ||||
Project Director | Mr. L. U. D. Atapattu | 011 2884594 011 2884595 |
011 2884610 |
This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. |
Engineer | Mr. W.P.C.M. Fernando | This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Accountant | Mrs. L.Y.K.B. Karunarathne | |||
Administrative Assistant | Mrs. D. A. H. Desilva | |||
Office (Gen.) | ||||
Postal Address: Planning Division, RDA, 3 rd Floor, "Maganeguma Mahamedura", No.216, Denzil Kobbekaduwa Mawatha, Koswatta, Battaramulla | ||||
Deputy Project Director | Mrs. G.K.S. Karunasekara | 011 2046313 |
This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Senior Engineer | Mr. C.D.Ratnayake | 011 2046200 Ext. 1318 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Senior ICT Officer | Mrs. C.I.Raddella | 011 2046200 Ext. 1337 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Project Assistant | Mrs. M.P.Gunawardane | 011 2046200 Ext 1344 |
This email address is being protected from spambots. You need JavaScript enabled to view it. |
|
Top | ||||
Climate Resilience Improvement Project (CRIP) | ||||
Postal Address: No. 122, Main Street, Battaramulla. | ||||
Project Director | Mr. L.U.D. Atapattu | 011 2884594 011 2884595 |
011 2884610
|
This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Director | Mr. M. E. Jayawardena | This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Engineer | Mr. Priyan | This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Administrative Assistant | Ms. D.A.H. Desilva | |||
Office (Gen.) | ||||
Top | ||||
Improvements to Central Expressway Connectivity Roads in Kandy and its suburbs | ||||
Postal Address: No. 122, Main Street, Battaramulla. | ||||
Project Director | Mr. L.U.D. Atapattu | 011 2884594 011 2884595 |
011 2884610
|
This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. This email address is being protected from spambots. You need JavaScript enabled to view it. |
Deputy Director | Mr. M. E. Jayawardena | This email address is being protected from spambots. You need JavaScript enabled to view it. |
||
Engineer | This email address is being protected from spambots. You need JavaScript enabled to view it. |
|||
Accountant | Ms. Blyth Karunarathna | |||
Accountants Assistant | Ms.Chandarani | |||
Administrative Assistant | Ms. D.A.H. Desilva | |||
Office (Gen.) | ||||
Top |
Project | : | Climate Resilience Improvement Project |
Type | : | Foreign Aid Loan |
Funding Agency | : | World Bank |
Description | Location | Length | Width | Commencement Date | Target Completion Date | Progress as at 30th Jun 2020 | Remark |
Construction of bridge nos. 53/1 & 53/2 on Colombo-Ratnapura-Wellawaya - Batticaloa (A004) Road (CRIP/WORKS/RDA/NCB/304) | Bridge Nos. 53/1 & 53/2 | 420m | 24m | 08 Feb 2017 | 09 Feb 2018 | 29% | Decided to go for mutual termination due to delay in land acquisition. The objective of flood prevention has been achieved by improving flow of 53/5 Bridge |
Rectification of Land Slide Between Culvert No 75/5 to 76/4 on Peradeniya - Badulla - Chenkaladi Road (A005) Road (CRIP/WORKS/RDA/NCB/308) | Culvert No 75/5 to 76/4 | - | - | 25 May 2017 | 31 Aug 2020 | 93.50% | Delay due to slow progress of the contractor and rainy weather, covid 19 |
Re- Construction of Bridge No. 23/1 on Warakapola - Ruwanwella Road (B457) (CRIP/WORKS/RDA/NCB/318) | Bridge No. 23/1 | 240m | 10.4m | 21 Jun 2017 | 19 Nov 2020 | 76.66% | Delayed due to slow Progress of the Contractor,land Acquisition, inclement weather , covid 19 |
Construction of New Bridge at CH 15+500,at Thalwila Estuary on Nainamadama -Iranawila-Chilaw (B640) Road (CRIP/WORKS/RDA/NCB/320) | Bridge at CH 15+500,at Thalwila Estuary | 80m Bridge & 100m approach on either sides | 10.4m | 27 Mar 2019 | 30 Nov 2020 | 71% | Work in progress |
Design and Construction of Rock fall Protection Works Between Culvert Nos. 41/9 and 41/10, between 50th km and Culvert No.51/1 & between Culvert Nos. 55/3 and 55/6 on Kandy -Mahiyanginuyu Road (A026) (CRIP/WORKS/RDA/NCB/321) | Culvert Nos. 41/9 and 41/10, between 50th km and Culvert No.51/1 & between Culvert Nos. 55/3 and 55/6 | - | - | 03 Jul 2019 | 30 Oct 2020 | 51% | Work in progress |
Supply and installation of Instruments in Land Slide areas in A026, A004, A005 & A007 Roads (CRIP/WORKS/RDA/NCB/323) | Land Slide areas in A026, A004, A005 & A007 Roads | - | - | 19 Jun 2019 | 30 Sep 2020 | 60% | Work in progress |
Re-Construction of Bridge No. 60/5 on Thiruwanketiya - Agalawatta (B421)Road (CRIP/WORKS/RDA/NCB/325) | Bridge No.60/5 | 150m | 10.4m | 20 Sep 2019 | 31 Oct 2020 | 63% | Work in progress |
i) Re-Construction of Bridge No. 98/4 on Colombo- Ratnapura - Wellawaya - Batticaloa (A004) Road ii) Re-Construction of bridge at ch. 0+480 km on Ehaliyagoda Bypass Road (CRIP/WORKS/RDA/NCB/326) | Bridge No. 98/4 Bridge & 0+480km on Ehaliyagoda Bypass Road | i) 80m ii) 150m | i) 12.4m ii) 16m | 19 Oct 2019 | 30 Nov 2020 | 48.89% | Work in progress |
Construction of a New Bridge by replacing existing causeway No. 1/2 on Sri Baritheendra Mawatha (B397(h)) across Malwathu oya, Anuradhapura (CRIP/WORKS/RDA/NCB/327) | Causeway No. 1/2 on Sri Baritheendra Mawatha (B397(h)) across Malwathu oya, Anuradhapura | 1150m | 9.80m | 09 Oct 2019 | 15 Dec 2020 | 65% | Work in progress |
Re-Construction of 02 Nos Bridges [ 6/1, 6/3 on KRW B168 RD.] on National Highways In Gampaha Chief Engineer’s Region (CRIP/WORKS/RDA/NCB/329) | Bridge No. 6/1 and Bridge No. 6/3 | 120m | 10.4m | 16 May 2020 | 14 Oct 2020 | 2.00% | Delayed due to late Mobilization of the Contractor and submission of documents to sign Contract. |
Re-Construction of 03 Nos Bridges [2/3 PH B354 rd., 6/1 MI B285 rd., 3/3 KN B207 rd.] on National Highways in Colombo & Kaluthara Chief Engineer’s Region (CRIP/WORKS/RDA/NCB/330) | Bridge No. 2/3 & Bridge No. 6/1 & Bridge No. 3/3 | 250m | 10.4m | 18 May 2020 | 17 Oct 2020 | 22% | Work in progress |
Re-construction of 02 nos. bridges [31/2, 15/3 ] on Paranthan - Mulativu - Knochchi Road in Mulativu Chief Engineer’s Region (CRIP/WORKS/RDA/NCB/333) | Bridge No. 31/2 and Bridge No 15/3 | 100m | 10.4m | 05 May 2020 | 04 Oct 2020 | 20% | Work in progress |
Re-construction of Bridge No. 18/1 & Bridge No.18/2 on Nawalapitiya - Dolosbage (B 318) Road in Kandy Chief Engineer’s Region (CRIP/WORKS/RDA/NCB/334) | Bridge No. 18/1 & 18/2 | 100m | 8.5m | 26 May 2020 | 05 Nov 2020 | 3% | Work in progress |
Funded By : World Bank | ||||||||
Project |
Type |
Location/Objective
|
Commencement |
Target Completion Date |
Description |
Progress as at |
Remarks |
|
Transport Connectivity & Asset Management Project (TCAMP) |
Foreign Aid Loan |
The main objectives of developing and operationalizing Road Asset Management System in the RDA are to optimize the economic benefit by minimizing the road maintenance costs and road user cost, determination of timing & cost of interventions to reduce life cycle cost and Monitor and track performance of completed work. |
08/07/2018
|
31/03/2023
|
Scope of works :- Institutional Strengthening and Capacity Building (RDA) | |||
1. | Operationalizing asset management system and unit; related capacity building | 7.27% | ||||||
2. | Capacity Building, training, and consultancies, Road Safety | 2.04% | ||||||
3. | Equipment | |||||||
4. | Incremental Operating Cost | 15.96% | ||||||
5. | Work deleted under Restructuring | 100% |